VÚMZ SK specializes in the delivery of comprehensive technological solutions, covering the entire process from design and production to subsequent servicing and consulting. This article will guide you through the individual phases of the project and demonstrate how VÚMZ SK ensures the successful implementation of every tailor-made project for its customers.
Pre-Implementation Activities
The first step in the project implementation process is a thorough analysis of the customer’s requirements. In this phase, the company:-
- accepts and analyzes client requirements, taking into account their specific needs and expectations
-
- conducts a detailed analysis of the input material (e.g., type of waste, volume flows in waste sorting)
-
- calculates material flows to prepare an optimal solution
-
- designs spatial solutions for the project, taking into account efficient use of space and safety standards
-
- handles negotiations with technology suppliers and prepares a preliminary offer for the customer
Implementation Activities
After the contract is signed, the project realization begins, which includes:-
- Project Management: this phase ensures effective management of all processes and coordination of individual project steps
-
- Engineering: this stage involves the creation of project documentation containing all details necessary to obtain a building permit
-
- Production and assembly of technologies: the production of devices is carried out according to the specifications and requirements of the project. After production is completed, the delivery and installation of technologies on-site take place
-
- Integration activities for subcontracting: coordination with external suppliers and integration of their solutions into the overall system
-
- Commissioning: after all technical work is completed, the system is put into operation and its functionality is tested
-
- Documentation and legislative processes: the project ends with the handover of the complete system to the customer, including all documents, manuals, and operating instructions
Post-Implementation Activities
After the successful handover of the system, VÚMZ SK continues to provide support and service for its clients. The main post-implementation activities include:-
- Customer service: the company offers warranty and post-warranty service for all delivered devices and technologies
-
- Monitoring and supervision: ongoing monitoring of system functionality and performance helps optimize operations
-
- Consulting and training: throughout the lifecycle of the device, expert consulting and retraining are available to help the customer achieve maximum efficiency
-
- Supply of spare parts and improvement proposals: if needed, VÚMZ SK ensures the supply of spare parts and regularly analyzes possibilities for improving and modernizing the system
Project Example: Sorting Municipal Plastic Waste
One of the projects carried out by the company is [sorting municipal plastic waste](https://www.vumz.sk/triediace-linky-na-spracovanie-odpadu/). This project focused on sorting waste to optimize its processing and utilization:-
- Input material flow: 3 tons of plastic waste per hour, consisting of various types of PET, films, and Tetra Pak
-
- Technology used: the company uses technologies such as TOMRA Autosort and LUBO ELLIPTICAL XL, offering high precision and reliability in sorting
-
- Design proposal: a 3D dynamic model was used for spatial planning, enabling collision checks and optimal placement of all components